Prata, B. de A. (2013) “Using a Maximal Covering Approach for the Vehicle and Crew Scheduling: A Case of Study”, Sistemas & Gestão, 8(3), p. 266–275. doi: 10.7177/sg.2013.V8.N3.A5.